Online Collaboration Tool

Webmail Access

Contact Us

+44 (0) 20 8317 7557

+44 (0) 20 8317 7741

linkedin.com/company/martin-arnold

Find Us

Head Office

Martin Arnold
4 Gunnery Terrace
The Royal Arsenal
London
SE18 6SW

Gatwick Office

Unit 3
The Beehive
City Place
West Sussex
RH6 0PA

Close

Rivermead Demountable Pool

Project Insights

  • Client Greenwich Leisure Limited
  • Contractor World Leisure UK
  • Contract Value £2,000,000
  • Duration 7 Months
  • Address Rivermead Leisure Complex, Richfield Avenue, Reading, Berkshire RG1 8EQ
  • Development Erection of a single, demountable swimming pool with associated changing facilities and plant room; to be constructed as an extension of the existing building, connected to the main pool building via a link corridor.

Project Description

Due to the proposed closure of a major swimming provision in Reading, the Council instructed MA to design and procure a demountable swimming pool solution, to an existing leisure site in the town. MA worked closely with the Client and contractor throughout a two-staged tender process, to develop, design and see the project through planning approval. After which Martin Arnold acted as Employer’s Agent through the construction period.

Added Value

Martin Arnold’s in-house architectural team were involved from project inception, and were able to work closely with the project surveyors and the Client to develop a scheme that suited complex planning requirements, as well as practicalities and cost for the Client.

Project Images

Related Projects

MA News

Martin Arnold @MA_Surveyor